Ticket Number: 20070808_1Ticket State: CLOSED
Ticket Opened: 2007-08-08 15:21Ticket Closed: 2008-01-16 17:02
Ticket Description: Scheduled power interruption UniL BFSH1 (Internef)
Scheduled Starttime: Scheduled Endtime:

Problem Description:

2007-08-14 07:30 - 08:00
Due to maintenance work, all of our equiment at this location will shutdown.
The network of UniL-Internef will be affected.
Network traffic of SWITCH backbone will automatically rerouted via alternative links.
The SWITCH equipment at CP2 location will not be affected - network traffic to CP2 will automatically rerouted via EPFL.

Affected:

From 2007-08-14 07:30 until 2007-08-14 08:00
Impact: Partial loss of connectivity
Sites/Services: EPFL, IMD, UNIL


Actions:


2007-08-16 10:20
Deltanet set the missing patch at the DWDM node in Basel.
The 10GE link between LS2 and EZ2 is up.

2007-08-15 11:00
Deltanet replaced the 10GE module at UniL. This spare module uses a different optical channel than the original one and needs unfortunately - an additional patch at the DWDM node in Basel.
Deltanet will set this patch tomorrow morning.

2007-08-14 17:20
Tomorrow morning Deltanet will replace the 10GE module at UniL.

2007-08-14 15:15
SWITCH pulled out/in the 10GE modul mEZ13-c4 at ETHZ - which didn't help.
Deltanet is informed about this remaining problem.

2007-08-14 13:34
Deltanet replaced the optical amplifier at UniL.
Most link are up again.
10GE link between LS2 and EZ2 is still down.

2007-08-14 09:45
Pulling out/in the amplifier module didn't help.
Deltanet will install a new amplifier this afternoon.

2007-08-14 09:10
As a side effect of the power interruption an optical amplifier is defect now.