Ticket 20120125_1

Ticket Number: 20120125_1Ticket State: CLOSED
Ticket Opened: 2012-01-25 07:38Ticket Closed: 2012-01-30 13:35
Ticket Description: Scheduled interruption EIC - HEIG-VD
Scheduled Starttime: 2012-01-30 12:15:00Scheduled Endtime: 2012-01-30 12:45:00

Problem Description:

There will be maintenance by EIC in Changins.
During this work the P2P connection between EIC and HEIG-VD in Yverdon will be interrupted.

Affected:

From 2012-01-30 13:07 until 2012-01-30 13:37
Impact: no more redundancy
Service: P2P/OPN
Sites: HESSOYV-EIC-yv2-eic2


From 2012-01-30 12:47 until 2012-01-30 13:07
Impact: Total loss of connectivity
Service: P2P/OPN
Sites: HESSOYV-EIC-yv2-eic2
From 2012-01-30 12:47 until 2012-01-30 13:07
Impact: Total loss of connectivity
Service: P2P/OPN
Sites: HESSOYV-EIC-yv2-eic2


Actions:


2012-01-30 13:37
MR from EIC found a not tightly plugged fiber connector near Library and fixed it. Link to EPFL now up. All services restored. Closing ticket

2012-01-30 13:07
maintenance completed. However the link to EPFL is still down. Only link to Cern ist up&running. Contacted EIC staff to investigate

2012-01-30 12:47
maintenance started


For all questions about this ticket, please send mail to noc@switch.ch