SWITCHlan Trouble Tickets

Transparency is very important to us. We therefore publish all trouble tickets about issues that have an impact on our customers. We show both currently open tickets as well as all closed tickets.

Ticket 20171113_1

Ticket Number: 20171113_1Ticket State: CLOSED
Ticket Opened: 2017-11-13 13:57Ticket Closed: 2017-11-22 09:07
Ticket Description: Scheduled maintenance work @EPFL
Scheduled Starttime: 2017-11-15 13:00:00Scheduled Endtime: 2017-11-16 14:00:00

Problem Description:

On Wednesday Nov 15 and Thursday Nov 16, SWITCH will do major reconfiguration work in its PoP @EPFL in Lausanne. The existing main router will be expanded and an additional, new router will be installed for low bandwidth regional links. A large number of links will have be moved to new interfaces. At the end of the work, a full rack of equipment will be decommissioned and dismounted.
No service restrictions are expected during the work for any customer. Redundancy will be reduced for short periods during recabling.

Affected:

From 2017-11-15 13:00 until 2017-11-16 14:00
Impact: no more redundancy
Service: P2P/OPN
Sites: HESSO-AVP, HESSO-ECAL, HESSO-EESP, HESSO-EIC


From 2017-11-15 13:00 until 2017-11-16 14:00
Impact: no impact
Service: network access
Sites: CHUV, EHL, EPFL, SWITCH-CLOUD, UNIL

Actions:


2017-11-16 15:30
End of work; the old SWITCH rack is now empty and ready for removal.

2017-11-15 15:45
Rewiring triggered a problem on a remote router which severely affected OPN connectivity for about 35 minutes in the western part of our network; see separate ticket
https://www.switch.ch/network/operations/trouble-tickets/?action=show&id=1322


For all questions about this ticket, please send mail to noc@switch.ch