SWITCHlan Trouble Tickets

Transparency is very important to us. We therefore publish all trouble tickets about issues that have an impact on our customers. We show both currently open tickets as well as all closed tickets.

Ticket 20080623_1

Ticket Number: 20080623_1Ticket State: CLOSED
Ticket Opened: 2008-06-23 13:25Ticket Closed: 2008-09-22 14:29
Ticket Description: Scheduled Router Hardware Upgrade PoP VSnet/ReRo Martigny
Scheduled Starttime: Scheduled Endtime:

Problem Description:

On Thursday 26.6.2008 between 10:00 and 15:00 SWITCH will replace the router chassis of swiMY2.switch.ch. This router must be powered-off for the maintenance.

Please ignore any alarms from the PoP Martigny during this maintenance window.

This work is not service affecting as the router acts as a backup device.


From 2008-06-26 11:20 until 2008-06-26 14:00
Impact: no more redundancy
Sites/Services: VSNET


2008-06-27 13:00
The new router is running stable since more than 24 hours, closing ticket.

2008-06-26 14:00
The hardware upgrade has been carried out. New router swiMY2 (Cisco 7604) operational. All links are up and running.

2008-06-26 11:20
The maintenance has started. Shutting down swiMY2.switch.ch

2008-06-23 13:50
Sunrise Netwatch opened ticket reference #241515

For all questions about this ticket, please send mail to noc@switch.ch
or call +41 44 268 15 30.