Ticket 20080804_1

Ticket Number: 20080804_1Ticket State: CLOSED
Ticket Opened: 2008-08-04 10:05Ticket Closed: 2009-05-19 16:30
Ticket Description: Scheduled Redundancy Upgrade PoP WSL
Scheduled Starttime: Scheduled Endtime:

Problem Description:

This afternoon (Monday, August 4th) between 13:30 and 17:00 our PoP WSL in Birmensdorf will be converted to a redundant router setup.
During the upgrade procedure Internet connectivity of WSL might be interrupted for several minutes.
Backbone connectivity between swiWSL2 and IBM2, as well as swiWSL2 and EZ2 will be interrupted for some time as well. Thus, the IBM PoP in Rüschlikon will lose redundancy in that time period.

Affected:

From 2008-08-04 15:28 until 2008-08-05 12:19
Impact: no more redundancy
Sites/Services: IBM


From 2008-08-04 15:28 until 2008-08-04 15:37
Impact: Total loss of connectivity
Sites/Services: WSL


Actions:


2008-08-05 12:19
interconnection between WSL1 and WSL2 is setup and redundancy backbone bath is complete again.

2008-08-04 17:32
new router WSL1 is online.

2008-08-04 15:37
new router WSL2 is back up again.

2008-08-04 15:28
old router WSL2 is shutdown.