Ticket 20070831_1

Ticket Number: 20070831_1Ticket State: CLOSED
Ticket Opened: 2007-08-31 09:44Ticket Closed: 2008-09-22 15:07
Ticket Description: Scheduled power interruption swiWI2 (Winterthur)
Scheduled Starttime: Scheduled Endtime:

Problem Description:

Due to maintenance work in the building where our router swiWI2 is installed,
the power will be switched off on Monday evening, 3.9.2007.
No loss of connectivity is expected - traffic will be rerouted automatically.

Affected:

From 2007-09-03 19:14 until 2007-09-03 20:15
Impact: no more redundancy
Sites/Services: PHTG, ZHWIN


Actions:


2007-09-03 20:14
swiWI2.switch.ch is back up and carrying traffic again.

2007-09-03 19:14
Router swiWI2.switch.ch was powered off. ZHW Winterthur's traffic is routed through backup router swiWI1.switch.ch.


For all questions about this ticket, please send mail to noc@switch.ch