Ticket 20160928_3

Ticket Number: 20160928_3Ticket State: CLOSED
Ticket Opened: 2016-09-28 10:42Ticket Closed: 2016-09-29 18:30
Ticket Description: Scheduled maintenance on our backbone infrastructure in the area Spiez - Interlaken - Jungfraujoch
Scheduled Starttime: 2016-09-28 13:30:00Scheduled Endtime: 2016-09-29 16:00:00

Problem Description:

SWITCH is preparing its fiber infrastructure between Bern and Luzern for the imminent integration into our new core backbone using DWDM technology.
In this second step of our preparations, a new core router will be installed in Spiez. On Jungfraujoch, our access router will be replaced and the optical infrastructure adapted to the new design.
There will be several link rearrangements during this major maintenance lasting two days. The HFSJG research station on Jungfraujoch will be offline for about one hour during hardware replacement. For all other sites, no loss of connectivity is expected during this work, but there will be some services loosing resiliency for short periods of time.

Affected:

From 2016-09-29 11:00 until 2016-09-29 14:00
Impact: Total loss of connectivity
Service: P2P/OPN
Sites: UNIBE-HFSJGJFJ-be2-jfj2


From 2016-09-29 11:00 until 2016-09-29 16:00
Impact: no more redundancy
Service: network access
Sites: HSLU


From 2016-09-28 13:30 until 2016-09-29 16:00
Impact: no more redundancy
Service: P2P/OPN
Sites: UNIBE-HFSJGJFJ-be2-jfj2


From 2016-09-28 13:30 until 2016-09-28 16:30
Impact: no more redundancy
Service: network access
Sites: HSLU


Actions:


2016-09-29 18:45
all installations and link rearrangements successfully terminated