Ticket 20131029_1

Ticket Number: 20131029_1Ticket State: CLOSED
Ticket Opened: 2013-10-29 12:57Ticket Closed: 2013-10-30 17:29
Ticket Description: Scheduled Interruption of eastern ring
Scheduled Starttime: 2013-10-30 09:00:00Scheduled Endtime: 2013-10-30 17:00:00

Problem Description:

Tomorrow, 30.10.2013, some tests and measurements need to be performed in the area of Kreuzlingen and Sankt Gallen.
As a result, a few interruptions, with duration of approximately one minute, will take place, leaving some sites without redundancy.
However network access will not be affected at any time and for any of our sites.
All traffic will be rerouted automatically to backup routes.

Affected:

From 2013-10-30 09:02 until 2013-10-30 14:56
Impact: no more redundancy
Service: network access
Sites: FHSG, PHTG, UNISG, ZHAW

Actions:


2013-10-30 17:21
The series of tests and measurements were accomplished as expected. The total time of interruption is calculated to be 4.5 minutes.
Detailed information about the interrupt times follows.

Interrupts took place the following time intervals for the respective duration:
09:02-09:05 for 10sec
09:47-09:50 for 30sec
10:27-10:34 for 90sec
11:29-11:38 for 80sec
14:47-14:56 for 40sec


For all questions about this ticket, please send mail to noc@switch.ch
or call +41 44 268 15 30.