Upcoming Adoptions at Universities
Confirmed adoption
Organization | Date |
---|---|
Careum Stiftung | Jun 2023 |
PSI | Jun 2023 |
HEP VS / PH VS | Jul 2023 |
EHB / HEFP / SUFFP - Die eidgenössische Hochschule für Berufsbildung | *) |
*) unconfirmed adoption date
Here is the list of all organizations who have already integrated edu-ID.
Important notice
The changeover to edu-ID is a critical moment. In order to ensure a high quality of the process the following guidelines apply:
- Integrating the edu-ID at a university requires thorough planning and preparation. SWITCH should be contacted 3 to 6 months before the changeover to edu-ID.
- Adoption dates have to be mutually confirmed by SWITCH and the adopting organization. The confirmation for a time slot depend on the availablity of SWITCH staff. As a rule of thumb, SWITCH can migrate no more than one university per month.
- In order to allow sufficient time for preparations, the following work must be completed one month before the changeover:
- Development of the linking service at the university
- Successful test of the linking service
- Development of attribute synchronization (push or pull)
- Successful test of attribute synchronization (all attributes required for AAI/edu-ID are synchronized correctly)
- Documentation and communication material are ready