SWITCHlan Trouble Tickets

Transparency is very important to us. We therefore publish all trouble tickets about issues that have an impact on our customers. We show both currently open tickets as well as all closed tickets.

> > next page
Number State Opened Description
20210722_2 OPEN 2021-07-22 14:52:00 Scheduled maintenance GEN2-PAR-DFROUTE (27.8.2021)
20210722_1 OPEN 2021-07-22 10:03:00 Scheduled fiber maintenance between Arth-Goldau and Luzern (30.7.2021)
20210715_1 OPEN 2021-07-15 04:10:00 Scheduled maintenance on transatlantic PAR-NYC link (28.7.2021)
20210707_2 OPEN 2021-07-07 16:44:00 Scheduled fiber maintenance between Bern and Basel (12/13.8.2021)
20210618_1 OPEN 2021-06-18 13:43:00 Interruption on the fiber route Villigen - Regensdorf - Z├╝rich
20210531_1 OPEN 2021-05-31 16:08:00 Scheduled maintenance between Villigen and Regensdorf (16.7.2021)
20210514_3 OPEN 2021-05-14 15:20:00 Scheduled upgrade of HES-SO Geneva's SWITCHlan access links (I) (23.8.2021)
20210511_3 OPEN 2021-05-11 16:43:00 Scheduled maintenance near Glion (28.5.2021)
20210322_1 OPEN 2021-03-22 08:35:00 Scheduled maintenance between Bern and Thun (postponed, tbd)
20210723_2 CLOSED 2021-07-23 08:30:00 Scheduled emergency maintenance on NEA3R transatlantic link (24.7.2021)
20210723_1 CLOSED 2021-07-23 07:04:00 Scheduled maintenance on GEN-PAR link (27.8.2021)
20210713_2 CLOSED 2021-07-13 14:08:00 Short power loss in WSL Birmensdorf lab building (13.7.2021)
20210713_1 CLOSED 2021-07-13 08:06:00 NEA3R LL Unstable
20210710_1 CLOSED 2021-07-10 08:44:00 Links between Basel and PSI Villigen down (8.7.2021)
20210707_1 CLOSED 2021-07-07 17:10:00 Fiber cut between Bulle and Fribourg (7.7.2021)
20210705_1 CLOSED 2021-07-05 11:28:00 Interruption of power supply at the SNM (5.7.2021)
20210705_2 CLOSED 2021-07-05 07:34:00 Scheduled software upgrade swiEHL2 and swiCHU1 (12.7.2021)
20210702_1 CLOSED 2021-07-02 13:34:00 Scheduled fiber swap in Davos (5.7.2021)
20210701_1 CLOSED 2021-07-01 11:24:00 Scheduled maintenance on HES-SO Geneva primary SWITCHlan uplink (5.7.2021)
20210629_1 CLOSED 2021-06-29 10:17:00 Scheduled work on the power distribution @FFHS Regensdorf (13.7.2021)