SWITCHlan Trouble Tickets

Transparency is very important to us. We therefore publish all trouble tickets about issues that have an impact on our customers. We show both currently open tickets as well as all closed tickets.

Ticket 20210831_1

Ticket Number: 20210831_1Ticket State: CLOSED
Ticket Opened: 2021-08-31 10:20Ticket Closed: 2021-09-24 11:21
Ticket Description: Scheduled fiber maintenance UPC Horw-Luzern (23/24.9.2021)
Scheduled Starttime: 2021-09-24 00:01:00Scheduled Endtime: 2021-09-24 06:00:00

Problem Description:

UPC has announced a maintenance window for fiber work by an external partner. SWITCH has enough redundancy options in the area that even during the maintenance redundant access and OPN links will be maintained. There is no customer impact expected, this ticket is purely informational.

Affected:

From 2021-09-24 00:01 until 2021-09-24 06:00
Impact: no impact
Service: P2P/OPN
Sites: HSLU-LZ-AG


From 2021-09-24 00:01 until 2021-09-24 06:00
Impact: no impact
Service: network access
Sites: HSLU


Actions:


2021-09-24 11:21
The maintenance has concluded, the link is back up and stable since 04:36. This ticket will now be closed.


All times are in local Swiss time CET / CEST.
For all questions about this ticket, please send mail to noc@switch.ch
or call +41 44 268 15 30.