Ticket 20230829_1
Ticket Number: | 20230829_1 | Ticket State: | CLOSED | ||
---|---|---|---|---|---|
Ticket Opened: | 2023-08-29 08:40 | Ticket Closed: | 2023-08-30 11:24 | ||
Ticket Description: | Scheduled Scheduled maintenance PoP KR (30.08.2023) | ||||
Scheduled Starttime: | 2023-08-30 10:00:00 | Scheduled Endtime: | 2023-08-30 11:30:00 |
Problem Description:
We need to replace malfunctioning equipment in our PoP Kreuzlingen. At the moment traffic is still running through it but changes to the system have become impossible.The maintenance will interrupt our north eastern ring, so the PoPs along it and some optical links through it will temporarily lose their redundant routes, as listed below.
Affected:
From 2023-08-30 10:00 until 2023-08-30 11:30Impact: no more redundancy
Service: network access
Sites: BELWUE, OST-SG, PHTG, UNISG
From 2023-08-30 10:00 until 2023-08-30 11:30
Impact: no more redundancy
Service: P2P/OPN
Sites: BELWUE-KIT-CE, EmpaEawag-SGE, L2VPN-OST-SG, OST-Waldau-bu1-go2, OST-Waldau-bu2-fhsg2, PSIE-CSCSBT
Actions:
2023-08-30 11:24
The unresponsive part has been replaced. The other one, with only minor issues, is still installed, as we didn't have enough spares on hand. It will be addressed later in a separate maintenance. For now the system is stable, and redundancies are restored.
All times are in local Swiss time CET / CEST.
For all questions about this ticket, please send mail to noc@switch.ch
or call +41 44 268 15 30.